Fire resistance of buildings
Approved Document B Fire Safety, Volume 2, Buildings other than dwellinghouses (2019 edition), defines fire resistance as:
'The ability of a component or a building to satisfy, for a stated period of time, some or all of the appropriate criteria given in the relevant standard.'
Fire resistance is a measure of one or more of the following:
- Resistance to collapse (loadbearing capacity), which applies to loadbearing elements only, denoted R in the European classification of the resistance to fire performance.
- Resistance to fire penetration (integrity), denoted E in the European classification of the resistance to fire performance.
- Resistance to the transfer of excessive heat (insulation), denoted I in the European classification of the resistance to fire performance.
Fire resistance is measured in minutes. This relates to time elapsed in a standard test and should not be confused with real time.
Performance in terms of the fire resistance to be achieved by elements of structure, doors and other forms of construction is classified in accordance with BS EN 13501.
Other information about fire resistance in the approved document includes:
- Table B3 gives the specific requirements for each element of structure.
- Table B4 sets out the minimum periods of fire resistance for elements of structure.
- Table B5 sets out limitations on the use of uninsulated fire resisting glazed elements.
NB PAS 9980:2022, Fire risk appraisal of external wall construction and cladding of existing blocks of flats – Code of practice, published by BSI Standards Limited in 2022, defines fire resistance as the: ‘…ability of an item to fulfil for a stated period of time the required loadbearing capacity and/or integrity and/or thermal insulation, and/or other expected duty specified in a standard fire resistance test. NOTE This is not the time that the item can withstand exposure to any specific real fire without loss of its required performance.’
[edit] Related articles on Designing Buildings
- Adhesives.
- BS 476.
- BS EN 13501-1.
- Cavity barrier.
- Compartment floor.
- Dry riser.
- Escape route.
- Fire.
- Fire and rescue service.
- Fire blanket.
- Fire collar.
- Fire compartment.
- Fire damper.
- Fire detection and alarm systems.
- Fire door.
- Fire safety design.
- Fire-separating element.
- Fire separation.
- Fire-stopping.
- Firefighting route.
- Intumescent coatings.
- Intumescent strip.
- Joint fire code.
- Mastic asphalt flooring.
- Means of escape.
- Passive fire protection is a vital tool in any fire strategy.
- Place of special fire hazard.
- Protected escape route.
- Protected stairway.
- Sacrificial timber.
- Supporting construction.
- Thermoplastic material.
- Unprotected escape route.
- Wet riser.
Featured articles and news
Delivering on a sustainability policy and action plan
How ECA exceeded its carbon reduction targets.
UKCA and CE marking; changes in detail
Pre and post brexit, now and the future of product certificates.
Construction product certification schemes
The role, background to and types of products certificates.
The construction industry ramps up for the general election
Election manifestos, charters, campaigns and comments.
Collaboration benefits of real-time file synchronisation
Three areas for users to focus on.
Time to recognise construction’s top talent.
Future of Green Skills in Sussex
A report on the incoming Green Skills revolution.
Sustainable Futures: Redefining Retrofit for Net Zero Living
The BSRIA Briefing 2024.
When flat roof specification becomes compromised.
Be alert to special features and techniques.
Practising Architect and Director of Sheldon Peever Studio.
Biodiversity net gain, tips and tools for small sites
How to deal with BNG when options become limited.
Registered building inspectors
Building types and conflicts of interest updates explained.
A brief run-down reminder of key points to note.
New electrical apprentice rates
Fair pay for much needed pipeline of electrical apprentices.
BSRIA's commitment to sustainability and net zero
Comments